The Ogun State Government and DP World MEA FZE signed memoranda of understanding (MoUs) in Paris on 24 September 2026 for the Gateway Deep Sea Port at Ogun Waterside and the Ogun Blue Marine Special Economic Zone, Channels Television reported. President Bola Tinubu witnessed the signing, alongside the Minister of Marine and Blue Economy, Adegboyega Oyetola, the Director-General of the Nigerian Ports Authority (NPA), Abubakar Dantsoho, and Governor Dapo Abiodun. The projects were presented as involving more than US$7bn in initial investment.
What was signed
According to the State House and Channels, the port is planned with a 4 km berth and an 18-metre draft, intended to take larger vessels and relieve pressure on the Lagos port corridor. The economic zone is proposed at 10,000 hectares for manufacturing, processing and export-oriented industry. The parties projected more than 50,000 direct jobs. The State House linked the projects to the 28 km Ogun section of the Lagos-Calabar Coastal Highway, a proposed Nigerian Navy operating base and the OK LNG project.
President Tinubu said the Federal Government “would continue to provide regulatory clarity, policy stability and a predictable business environment to support long-term investment”, and pledged road, rail and power connectivity and the removal of bureaucratic obstacles.
What remains open
ThisDay reported that the documents are MoUs initiating development, and that no timelines, concession terms or PPP structure were disclosed. Governor Abiodun said history would judge the parties not by the documents signed but by the transformation that follows.
Get the next Meridian Briefing. Every Thursday at 11:00 WAT.
Why it matters
An MoU is not a concession. A state-sponsored deep seaport engages federal law at several points: port development and operation fall within the Nigerian Ports Authority’s statutory remit, and any operating concession would ordinarily require federal approvals and a procurement process consistent with the Infrastructure Concession Regulatory Commission Act. The presence of the NPA Director-General and the marine minister at the signing signals federal support, but investors and lenders will look for the binding instruments: a port concession or development agreement, land title for the zone, and the legal basis for the special economic zone, whether under the Nigeria Export Processing Zones Act or state legislation.
For counsel advising prospective tenants, contractors or financiers, the key diligence points will be the exclusivity and termination terms of the MoUs, how revenue and regulatory powers are split between Ogun State and federal agencies, and the interface with the separately planned Badagry and Lekki facilities along the same coast. Until definitive agreements are signed, the headline investment figure should be read as a statement of intent.






Leave a Reply